    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPPCE/PNV009 - Cost elements for construction progress reports are not maintained ?

    The SAP error message /SAPPCE/PNV009 Cost elements for construction progress reports are not maintained typically occurs in the context of project management and construction reporting within the SAP system. This error indicates that the system is unable to find the necessary cost elements that are required for generating construction progress reports.

    Cause:

    1. Missing Cost Elements: The primary cause of this error is that the cost elements required for the construction progress reports have not been defined or maintained in the system.
    2. Configuration Issues: There may be issues with the configuration settings in the Project System (PS) module or the controlling (CO) module.
    3. Project Settings: The specific project or WBS (Work Breakdown Structure) element may not have the necessary cost elements assigned.

    Solution:

    To resolve this error, you can follow these steps:

    1. Maintain Cost Elements:

      • Go to the transaction code OKB9 (or use the appropriate transaction for your version of SAP) to maintain cost elements.
      • Ensure that the relevant cost elements for construction progress reporting are created and properly configured.
    2. Check Project Settings:

      • Navigate to the project or WBS element in question and verify that the necessary cost elements are assigned.
      • Use transaction code CJ20N to access the project and check the settings.
    3. Configuration Review:

      • Review the configuration settings in the Project System and Controlling modules to ensure that all necessary settings are in place.
      • You may need to consult with your SAP configuration team or refer to the SAP documentation for specific configuration steps.
    4. Consult Documentation:

      • Refer to SAP Help documentation or notes related to construction progress reporting for any additional requirements or settings that may need to be configured.
    5. Testing:

      • After making the necessary changes, test the construction progress report generation again to ensure that the error has been resolved.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), OKB9 (Maintain Cost Elements), and CJI3 (Project Actual Line Items) for troubleshooting.
    • SAP Notes: Check for any SAP Notes that may address this specific error or provide additional guidance on maintaining cost elements for construction projects.
    • User Roles: Ensure that the user has the necessary authorizations to maintain cost elements and project settings.

    If the issue persists after following these steps, it may be beneficial to engage with your SAP support team or consult with an SAP expert who specializes in the Project System module.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker