How To Fix /SAPPCE/PNV009 - Cost elements for construction progress reports are not maintained


/SAPPCE/PNV009 - Overview

  • Message type: E = Error

  • Message class: /SAPPCE/PNV -

  • Message number: 009

  • Message text: Cost elements for construction progress reports are not maintained

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPPCE/PNV009 - Details

  • The SAP error message /SAPPCE/PNV009 Cost elements for construction progress reports are not maintained typically occurs in the context of project management and construction reporting within the SAP system. This error indicates that the system is unable to find the necessary cost elements that are required for generating construction progress reports.
    
    Cause: Missing Cost Elements: The primary cause of this error is that the cost elements required for the construction progress reports have not been defined or maintained in the system.
    Configuration Issues: There may be issues with the configuration settings in the Project System (PS) module or the controlling (CO) module. Project Settings: The specific project or WBS (Work Breakdown Structure) element may not have the necessary cost elements assigned.
    Solution: To resolve this error, you can follow these steps: Maintain Cost Elements: Go to the transaction code OKB9 (or use the appropriate transaction for your version of SAP) to maintain cost elements. Ensure that the relevant cost

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPPCE/PNV009 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker