How To Fix /SAPPCE/DPCM1068 - Percentage total &1 is greater than permitted value &2 percent


/SAPPCE/DPCM1068 - Overview

  • Message type: E = Error

  • Message class: /SAPPCE/DPCM1 -

  • Message number: 068

  • Message text: Percentage total &1 is greater than permitted value &2 percent

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPPCE/DPCM1068 - Percentage total &1 is greater than permitted value &2 percent ?
    The SAP error message /SAPPCE/DPCM1068 Percentage total &1 is greater than permitted value &2 percent typically occurs in the context of SAP's Project Controlling (PC) or Project Management (PM) modules. This error indicates that the total percentage allocated to a particular project or task exceeds the allowed limit set in the system.
    
    Cause: Exceeding Percentage Limits: The most common cause of this error is that the sum of the percentages assigned to various components (like tasks, phases, or resources) exceeds the maximum allowed percentage (usually set to 100%). Configuration Settings: The system may have specific configuration settings that limit the total percentage allocation for certain project elements. Data Entry Errors: Users may have inadvertently entered incorrect percentage values that lead to the total exceeding the permitted limit.
    Solution: Review Percentage Allocations: Check the percentage allocations for the relevant project or task. Ensure that the total does not exceed the permitted value (usually 100%). Adjust Values: If the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker