Message type: E = Error
Message class: /SAPPCE/DPCM1 -
Message number: 065
Message text: Percentage total &1 is greater than 100 percent
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPPCE/DPCM1065
- Percentage total &1 is greater than 100 percent ?The SAP error message /SAPPCE/DPCM1065 Percentage total &1 is greater than 100 percent typically occurs in the context of SAP Project System (PS) or SAP Controlling (CO) modules, particularly when dealing with planning or budgeting scenarios. This error indicates that the total percentage allocated to a particular project or cost element exceeds 100%, which is not permissible.
Cause: Incorrect Percentage Allocation: The most common cause is that the sum of the percentage allocations for various components (like tasks, cost elements, or resources) exceeds 100%. For example, if you have multiple tasks that are each assigned a percentage of the total budget, their combined total should not exceed 100%. Data Entry Errors: Manual data entry errors can lead to incorrect percentage values being inputted.
Configuration Issues: Sometimes, the configuration settings in the system may not align with the expected input, leading to discrepancies.
Solution: Review Percentage Allocations: Check the percentage allocations for the relevant project or cost
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPPCE/DPCM1064
WBS element &1 does not belong to down payment chain company code
What causes this issue? WBS element &V1& is assigned to the company code &V2&. The down payment chain belongs to the company code &am...
/SAPPCE/DPCM1063
Enter a percentage for assessment and additional costs
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/OM_ERROR2263
Error in memory: A new operator has failed
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
/SAPAPO/OM_ERROR2264
The response for an order is not 'Confirmation' or 'Rejection'
INCLUDE /SAPAPO/OM_ERROR_GENERAL OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
Click on this link to search all SAP messages.