Do you have any question about this error?
Message type: E = Error
Message class: /SAPNEA/J_SC -
Message number: 010
Message text: Valid date to is past to valid date from
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPNEA/J_SC010
- Valid date to is past to valid date from ?The SAP error message
/SAPNEA/J_SC010 Valid date to is past to valid date from
typically occurs in the context of scheduling or planning scenarios within SAP, particularly when dealing with time-dependent data such as scheduling jobs, planning resources, or managing project timelines.Cause:
This error indicates that the "Valid date to" (the end date of a validity period) is set to a date that is earlier than the "Valid date from" (the start date of a validity period). In other words, the system is trying to validate a time period where the end date is before the start date, which is logically incorrect.
Solution:
To resolve this error, you should:
Check the Dates: Review the dates you have entered for the validity period. Ensure that the "Valid date from" is earlier than the "Valid date to".
Correct the Input: If you find that the dates are incorrect, update them accordingly. Make sure that the "Valid date to" is set to a date that is equal to or later than the "Valid date from".
Review Related Configurations: If the dates are being populated automatically (e.g., through a program or a batch job), check the logic that sets these dates to ensure it is functioning correctly.
Consult Documentation: If you are unsure about the correct dates to use, refer to the relevant SAP documentation or consult with your SAP functional team for guidance on the expected date ranges for your specific scenario.
Testing: After making the necessary corrections, test the process again to ensure that the error no longer occurs.
Related Information:
If the problem persists after following these steps, consider reaching out to your SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPNEA/J_SC008
No form ID exists for program &
What causes this issue? There is no SAPscript layout sets defined in customizing for the program &V1&System Response The system issues an er...
/SAPNEA/J_SC007
Place the cursor on the correct line
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPNEA/J_SC011
Working period is under one year
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPNEA/J_SC012
Select at least one line
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.