Do you have any question about this error?
Message type: E = Error
Message class: /SAPMP/PUR -
Message number: 002
Message text: No more than one schedule line permitted for length material &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPMP/PUR002
- No more than one schedule line permitted for length material &1 ?The SAP error message
/SAPMP/PUR002 No more than one schedule line permitted for length material &1
typically occurs in the context of purchasing and materials management when dealing with length-based materials. This error indicates that the system does not allow more than one schedule line for a material that is defined as a length material.Cause:
- Material Type Configuration: The material in question is configured as a length material, which means it is treated differently in terms of scheduling and inventory management.
- Multiple Schedule Lines: The user is attempting to create or modify a purchase order or scheduling agreement that includes multiple schedule lines for a length material, which is not permitted by the system configuration.
Solution:
- Review Material Master: Check the material master data for the specific material (indicated by &1 in the error message). Ensure that it is correctly set up as a length material.
- Single Schedule Line: When creating or modifying a purchase order, ensure that you only create a single schedule line for the length material. If you need to order different quantities or delivery dates, consider creating separate purchase orders instead.
- Consult Configuration: If the business process requires multiple schedule lines for length materials, consult with your SAP configuration team to see if the system settings can be adjusted. However, this may not be advisable as it could lead to inconsistencies in inventory management.
- Documentation and Training: Ensure that users are aware of the restrictions regarding length materials and provide training on how to handle them correctly in the system.
Related Information:
If the issue persists after following these steps, it may be beneficial to engage with your SAP support team or consult SAP's official support channels for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPMP/PUR001
Item already configured; field &1 not changeable
What causes this issue? <ZK>&V1&</> was completed using the configuration.System Response The content of <ZK>&V1&&...
/SAPMP/PP_SFC_EXE_GM009
No planning system could be determined for material &1, plant &2
What causes this issue? At least one reservation item in the production order is relevant for the complete withdrawal. The system could not find a pl...
/SAPMP/PUR003
No configuration exists for length material &1
What causes this issue? The material &V1& is a configurable material. However, the material has not yet been configured in this document.Syst...
/SAPMP/PUR004
Character &1 is not a multiple of character &2 from purchase requisition
What causes this issue? The characteristic &V1& in the order must be a multiple of the characteristic &V2& from the purchase requisit...
Click on this link to search all SAP messages.