How To Fix /SAPMP/PP_BD017 - Max.prod.length must be greater than sum fixed scrap each + first lengths


/SAPMP/PP_BD017 - Overview

  • Message type: E = Error

  • Message class: /SAPMP/PP_BD -

  • Message number: 017

  • Message text: Max.prod.length must be greater than sum fixed scrap each + first lengths

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPMP/PP_BD017 - Max.prod.length must be greater than sum fixed scrap each + first lengths ?
    The SAP error message /SAPMP/PP_BD017 Max.prod.length must be greater than sum fixed scrap each + first lengths typically occurs in the context of production planning and process order management. This error indicates that the maximum production length defined for a production order is not sufficient to cover the required lengths, including fixed scrap and initial lengths.
    
    Cause: Configuration Issue: The maximum production length set in the production order or material master is too low compared to the sum of fixed scrap and initial lengths. Incorrect Data Entry: The values for fixed scrap or initial lengths may have been entered incorrectly, leading to an unrealistic configuration. Material Master Settings: The settings in the material master for the production process may not align with the actual production requirements.
    Solution: Review Production Order Settings: Check the production order for the maximum production length. Ensure that it is set to a value greater than the sum of fixed scrap and initial

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author