Do you have any question about this error?
Message type: E = Error
Message class: /SAPMP/OC_APO -
Message number: 021
Message text: Combined order &2 for original order &1 is not planned in SCM
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPMP/OC_APO021
- Combined order &2 for original order &1 is not planned in SCM ?The SAP error message
/SAPMP/OC_APO021
indicates that a combined order for an original order is not planned in the Supply Chain Management (SCM) system. This error typically arises in the context of Advanced Planning and Optimization (APO) when there is an issue with the planning of orders, particularly when dealing with combined orders.Cause:
- Missing Planning Data: The original order may not have been planned correctly in the SCM system, leading to the inability to create or manage combined orders.
- Order Status: The status of the original order may not allow for planning or may be in a state that prevents further processing.
- Configuration Issues: There may be configuration issues in the APO system that prevent the proper planning of combined orders.
- Master Data Issues: Incomplete or incorrect master data (like product master, location master, etc.) can lead to planning issues.
- Integration Issues: Problems with the integration between the ERP and SCM systems can also lead to this error.
Solution:
- Check Order Status: Verify the status of the original order to ensure it is in a state that allows for planning.
- Review Planning Data: Ensure that the original order has been properly planned in the SCM system. You may need to re-run the planning process for the original order.
- Validate Master Data: Check the master data related to the product and location to ensure it is complete and accurate.
- Configuration Review: Review the configuration settings in the APO system to ensure that combined orders are set up correctly.
- Integration Check: Ensure that the integration between the ERP and SCM systems is functioning correctly. This may involve checking for any errors in the data transfer process.
- Consult Documentation: Refer to SAP documentation or notes related to this specific error message for additional troubleshooting steps or patches.
Related Information:
/SAPAPO/SDP94
(for planning board) or /SAPAPO/MC90
(for checking planning results) to analyze the planning data.By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPMP/OC_APO020
Combined order &1 contains ERP and SCM-planned materials
What causes this issue? You want to activate an integration model that contains combined orders. With the original order &V2&, the combined o...
/SAPMP/OC_APO018
No capacity requirements for original order &1, operation counter &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPMP/PP_BD001
Enter a maximum production length
What causes this issue? <ZK><ZH>Max. Production Length</></> is a required entry field for the length calculation method that...
/SAPMP/PP_BD002
Max.prod.length and the fixed scrap first and last lengths contain values
<LS>&CAUSE&</> You tried to create or change a bill of material (BOM) or a routing. This is not possible because at least one of ...
Click on this link to search all SAP messages.