Do you have any question about this error?
Message type: E = Error
Message class: /SAPMP/OC_APO -
Message number: 020
Message text: Combined order &1 contains ERP and SCM-planned materials
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPMP/OC_APO020
- Combined order &1 contains ERP and SCM-planned materials ?The SAP error message
/SAPMP/OC_APO020
indicates that a combined order contains both ERP (Enterprise Resource Planning) and SCM (Supply Chain Management) planned materials. This situation typically arises in environments where both ERP and SCM systems are integrated, and it can lead to issues in planning and execution.Cause:
- Mixed Planning: The combined order is trying to include materials that are planned in different systems (ERP and SCM). This can happen if the materials are not consistently managed across the two systems.
- Configuration Issues: There may be configuration settings in the system that allow for the creation of combined orders with mixed planning types, which can lead to this error.
- Data Inconsistency: There might be inconsistencies in the master data between the ERP and SCM systems, leading to the inability to process the combined order.
Solution:
- Review the Order: Check the combined order to identify which materials are planned in ERP and which are planned in SCM. You may need to separate these materials into different orders.
- Adjust Planning Settings: If applicable, review the planning settings in both the ERP and SCM systems to ensure that they are aligned and that combined orders can only include materials from the same planning type.
- Data Synchronization: Ensure that the master data for materials is synchronized between the ERP and SCM systems. This may involve updating material master records or adjusting planning parameters.
- Consult Documentation: Refer to SAP documentation or notes related to this error message for specific guidance on how to resolve it in your system context.
- Contact SAP Support: If the issue persists, consider reaching out to SAP support for assistance, especially if this is a recurring problem in your environment.
Related Information:
By addressing the root cause of the error and ensuring proper configuration and data consistency, you can resolve the issue and prevent it from occurring in the future.
Get instant SAP help. Start your 7-day free trial now.
/SAPMP/OC_APO018
No capacity requirements for original order &1, operation counter &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPMP/OC_APO017
Selected orders are assigned to campaign(s)
What causes this issue? At least one of the orders that you have selected for combination is included in a production campaign. The material for the ...
/SAPMP/OC_APO021
Combined order &2 for original order &1 is not planned in SCM
What causes this issue? You want to activate an integration model that contains the original order &V1&. This original order belongs to the c...
/SAPMP/PP_BD001
Enter a maximum production length
What causes this issue? <ZK><ZH>Max. Production Length</></> is a required entry field for the length calculation method that...
Click on this link to search all SAP messages.