How To Fix /SAPCE/IU_MSG1121 - Contract &1: Budget billing plan not created. BB-Amount &2 &4 too high


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPCE/IU_MSG1 -

  • Message number: 121

  • Message text: Contract &1: Budget billing plan not created. BB-Amount &2 &4 too high

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPCE/IU_MSG1121 - Contract &1: Budget billing plan not created. BB-Amount &2 &4 too high ?

    The SAP error message /SAPCE/IU_MSG1121 indicates that there is an issue with the budget billing plan for a contract. Specifically, the error message states that the budget billing amount is too high, which prevents the system from creating the budget billing plan.

    Cause:

    The error can occur due to several reasons:

    1. Exceeding Budget Limits: The budget billing amount specified for the contract exceeds the allowed limits set in the system. This could be due to configuration settings or business rules that restrict the maximum budget billing amount.
    2. Incorrect Configuration: There may be incorrect settings in the configuration of the budget billing plan, such as thresholds or limits that are not aligned with the expected values.
    3. Data Entry Errors: The values entered for the budget billing amount may have been incorrectly calculated or inputted, leading to an amount that is deemed too high by the system.

    Solution:

    To resolve this error, you can take the following steps:

    1. Review the Budget Billing Amount: Check the budget billing amount specified for the contract. Ensure that it is within the acceptable limits defined in the system.
    2. Check Configuration Settings: Review the configuration settings for budget billing plans in the SAP system. Look for any thresholds or limits that may be causing the error. This may involve checking the following:
      • Transaction codes like SPRO to access the configuration settings.
      • The specific settings for budget billing plans under the relevant module (e.g., IS-U for Utilities).
    3. Adjust the Amount: If the budget billing amount is indeed too high, consider adjusting it to a value that is acceptable according to the system's configuration.
    4. Consult Documentation: Refer to SAP documentation or help files related to budget billing plans for additional guidance on the limits and configurations.
    5. Contact Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as FPL9 (for budget billing plan) and FPL1 (for creating budget billing plans).
    • SAP Notes: Check for any SAP Notes related to budget billing plans that may provide additional insights or solutions for similar issues.
    • User Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, and solutions shared.

    By following these steps, you should be able to identify the cause of the error and implement a solution to successfully create the budget billing plan for the contract.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant