Do you have any question about this error?
Message type: E = Error
Message class: /SAPCE/IU_MSG1 -
Message number: 120
Message text: Contract &1: Budget billing plan not created. BBP-Amount &2 &4 too low
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPCE/IU_MSG1120
- Contract &1: Budget billing plan not created. BBP-Amount &2 &4 too low ?The SAP error message
/SAPCE/IU_MSG1120
indicates that there is an issue with the budget billing plan (BBP) for a contract. Specifically, the error states that the BBP amount is too low, which prevents the creation of the budget billing plan for the specified contract.Cause:
The error can occur due to several reasons:
- Insufficient Amount: The amount specified for the budget billing plan is below the minimum required threshold set in the system.
- Configuration Issues: There may be configuration settings in the SAP system that define minimum amounts for budget billing plans, and the current amount does not meet these criteria.
- Contract Settings: The specific contract may have settings or conditions that restrict the creation of a budget billing plan under certain circumstances.
Solution:
To resolve this error, you can take the following steps:
- Check the Amount: Review the BBP amount specified for the contract. Ensure that it meets the minimum requirements set in the system.
- Review Configuration:
- Go to the configuration settings for budget billing plans in the SAP system. This can typically be found in the customizing settings under the relevant module (e.g., IS-U for Utilities).
- Look for settings related to minimum amounts for budget billing plans and adjust them if necessary.
- Contract Review:
- Check the specific contract details to ensure that all necessary conditions are met for creating a budget billing plan.
- Verify if there are any specific rules or restrictions applied to the contract that might affect the BBP creation.
- Consult Documentation: Refer to SAP documentation or help files related to budget billing plans for additional insights and guidelines.
- Contact Support: If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
SE11
(Data Dictionary) or SPRO
(Customizing) to access relevant configuration settings.By following these steps, you should be able to identify the cause of the error and implement a solution to successfully create the budget billing plan for the contract.
Get instant SAP help. Start your 7-day free trial now.
/SAPCE/IU_MSG1119
Contract &1: Factor for the key &2 &3 &4 doesn't exist in the tab. TE757
What causes this issue? System is looking for the amount adjustment factor to be able to adjust amounts of budget billing requests using the factor. ...
/SAPCE/IU_MSG1118
Contract &1: Error &2 while rounding BB request amounts
What causes this issue? While rounding amounts of budget billing requests for the contract &V1& occurred an error - exception &V2&.Sy...
/SAPCE/IU_MSG1121
Contract &1: Budget billing plan not created. BB-Amount &2 &4 too high
What causes this issue? Contract &V1& has not been entered in the budget billing plan because the budget billing amount determined &V2&am...
/SAPCE/IU_MSG1122
Contract &1: Budg.bill. request due day &2 was replaced by due day &4
What causes this issue? They are defined due days for generated budget billing requestes on the contract &V1&, third tab. But due day &V2...
Click on this link to search all SAP messages.