Do you have any question about this error?
Message type: E = Error
Message class: /SAPCE/IU_MSG1 -
Message number: 110
Message text: The currency for the BB plan of industry customer was not entered
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPCE/IU_MSG1110
- The currency for the BB plan of industry customer was not entered ?The SAP error message
/SAPCE/IU_MSG1110
indicates that the currency for the Business Blueprint (BB) plan of an industry customer has not been entered. This error typically arises in the context of industry solutions or specific configurations related to business planning and financial management.Cause:
- Missing Currency Configuration: The currency for the Business Blueprint plan has not been defined in the system for the specific industry customer.
- Incomplete Master Data: The master data for the industry customer may be incomplete, lacking necessary currency information.
- System Configuration Issues: There may be issues with the configuration settings in the SAP system that prevent the currency from being recognized or entered.
Solution:
Check and Enter Currency:
- Navigate to the relevant configuration settings for the industry customer.
- Ensure that the currency is defined for the Business Blueprint plan. This can typically be done in the customizing settings under the relevant industry solution.
- If necessary, enter the appropriate currency for the BB plan.
Review Master Data:
- Go to the master data records for the industry customer and verify that all required fields, including currency, are filled out correctly.
- Update the master data if any information is missing.
Consult Documentation:
- Refer to the SAP documentation or help files related to the specific industry solution you are using. This may provide additional insights into the required configurations.
Check User Authorizations:
- Ensure that the user has the necessary authorizations to make changes to the currency settings or master data.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance. They may provide specific guidance based on the version and configuration of your SAP system.
Related Information:
SPRO
for customizing or SE11
for data dictionary.By following these steps, you should be able to resolve the error message and ensure that the currency for the Business Blueprint plan is correctly entered for the industry customer.
Get instant SAP help. Start your 7-day free trial now.
/SAPCE/IU_MSG1109
The contr. &1 doesn't contain a currency for the budget billing requests
What causes this issue? During the invoicing are generated in user exit /SAPCE/IU_EVENT_R40 budget billing requests for the industry customer. The cu...
/SAPCE/IU_MSG1108
Contract &1: Budget billing plan for &2-&3 not created. BBP already exist
What causes this issue? It was found during the invoicing that in the scheduled billing period from &V1& to &V2& already exist the bu...
/SAPCE/IU_MSG1111
Contract &1: budget billing request due &2. It is befor &4 -> oper.&3
What causes this issue? The budget billing requests for the industry customer are generated during the invoicing. The system detected that the due (&...
/SAPCE/IU_MSG1112
Contr.&1: No BB requests generated for the ind.customer. All before &2.
What causes this issue? The invoicing generates BB requests for the industry customer from the event R R402 (/SAPCE/IU_EVENT_R402). The due date of a...
Click on this link to search all SAP messages.