Do you have any question about this error?
Message type: E = Error
Message class: /SAPCE/IU_MSG1 -
Message number: 109
Message text: The contr. &1 doesn't contain a currency for the budget billing requests
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPCE/IU_MSG1109
- The contr. &1 doesn't contain a currency for the budget billing requests ?The SAP error message
/SAPCE/IU_MSG1109
indicates that there is an issue with the budget billing requests due to the absence of a currency in the specified contract. This error typically arises in the context of SAP Convergent Invoicing or SAP Contract Accounts Receivable and Payable (FI-CA) when processing billing requests.Cause:
The error occurs when:
- The contract specified in the billing request does not have a currency assigned to it.
- The currency information is missing in the relevant master data for the contract.
- There may be inconsistencies in the configuration or data setup related to the contract.
Solution:
To resolve this error, you can take the following steps:
Check Contract Master Data:
- Navigate to the contract in question and verify that the currency field is populated. You can do this by accessing the contract through the relevant transaction code (e.g.,
BP
for Business Partner orCVI
for Contract Management).- If the currency is missing, update the contract to include the appropriate currency.
Review Configuration Settings:
- Ensure that the configuration settings for budget billing requests are correctly set up. This includes checking the settings in the relevant customizing transactions (e.g.,
SPRO
).- Verify that the currency settings in the controlling area and company code are correctly defined.
Check Related Master Data:
- Ensure that any related master data (such as customer master data) also has the necessary currency information.
- If the contract is linked to a specific customer, check the customer master data for currency settings.
Reprocess the Billing Request:
- After making the necessary updates, try to reprocess the budget billing request to see if the error persists.
Consult Documentation:
- If the issue continues, refer to SAP documentation or notes related to this error message for additional troubleshooting steps or patches.
Contact SAP Support:
- If you are unable to resolve the issue, consider reaching out to SAP support for further assistance, providing them with the error message and details of the steps you have taken.
Related Information:
BP
(Business Partner), CVI
(Contract Management), and SPRO
(Customizing).By following these steps, you should be able to identify and correct the underlying issue causing the error message /SAPCE/IU_MSG1109
.
Get instant SAP help. Start your 7-day free trial now.
/SAPCE/IU_MSG1108
Contract &1: Budget billing plan for &2-&3 not created. BBP already exist
What causes this issue? It was found during the invoicing that in the scheduled billing period from &V1& to &V2& already exist the bu...
/SAPCE/IU_MSG1107
Rate category &1 (installation &2 in contract &3) is not allowed
What causes this issue? The rate category &V1& was not found in the 'Table of allowed rate categories for the budget billing procedure &...
/SAPCE/IU_MSG1110
The currency for the BB plan of industry customer was not entered
What causes this issue? The program has detected that the currency for the budget billing plan of industry customer is empty. This is not allowed bec...
/SAPCE/IU_MSG1111
Contract &1: budget billing request due &2. It is befor &4 -> oper.&3
What causes this issue? The budget billing requests for the industry customer are generated during the invoicing. The system detected that the due (&...
Click on this link to search all SAP messages.