Message type: E = Error
Message class: /SAPAPO/TDL_DAO -
Message number: 068
Message text: Scheduling agreement &1 is inconsistent and is not used
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/TDL_DAO068
- Scheduling agreement &1 is inconsistent and is not used ?The SAP error message /SAPAPO/TDL_DAO068 indicates that there is an inconsistency with a scheduling agreement in the Advanced Planning and Optimization (APO) module. This error typically arises when the system detects that the scheduling agreement referenced is not in a valid state for processing.
Cause: Inconsistent Data: The scheduling agreement may have missing or inconsistent data, such as invalid dates, quantities, or other key fields. Status Issues: The scheduling agreement might be in a status that does not allow it to be used (e.g., deleted, blocked, or inactive). Master Data Issues: Related master data (like material master, vendor master, etc.) may be inconsistent or not properly maintained. Integration Issues: There may be issues with the integration between SAP ERP and SAP APO, leading to discrepancies in the data.
Solution: Check Scheduling Agreement: Review the scheduling agreement in the SAP system to ensure that all required fields are filled out correctly and that the agreement is in an
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/TDL_DAO067
Reference source referred to in scheduling agreemnt &1 could not be found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/TDL_DAO066
No source of supply found for transportation lane &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/TDL_DAO069
Quantity not reduced to &1 because GR &2 already posted (SA sch. line &3)
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/TDL_DAO070
LiveCache is not installed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.