How To Fix /SAPAPO/SRC084 - A planned delivery time greater than zero is always taken into account


/SAPAPO/SRC084 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/SRC -

  • Message number: 084

  • Message text: A planned delivery time greater than zero is always taken into account

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/SRC084 - A planned delivery time greater than zero is always taken into account ?
    The SAP error message /SAPAPO/SRC084 indicates that a planned delivery time greater than zero is being considered in the planning process. This message typically arises in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with supply chain planning and scheduling.
    
    Cause: The error message is triggered when the system encounters a situation where the planned delivery time (PDT) for a product is set to a value greater than zero. This means that the system is taking into account the time required to deliver the product, which can affect the planning and scheduling of orders. The message serves as a warning that the planned delivery time is influencing the availability and lead times of materials.
    Solution: To resolve this issue, you can take the following steps: Check Planned Delivery Time Settings: Navigate to the material master data for the affected product and check the planned delivery time settings. Ensure that the planned

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant