How To Fix /SAPAPO/SPPDRPSB040 - Planned order &1 contains multiple receipts


/SAPAPO/SPPDRPSB040 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/SPPDRPSB -

  • Message number: 040

  • Message text: Planned order &1 contains multiple receipts

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


/SAPAPO/SPPDRPSB040 - Details

  • The SAP error message /SAPAPO/SPPDRPSB040 Planned order &1 contains multiple receipts typically occurs in the context of Advanced Planning and Optimization (APO) when there are multiple receipts (such as production orders, purchase orders, or stock transfers) associated with a single planned order. This can lead to confusion in the planning process, as the system expects a one-to-one relationship between planned orders and receipts.
    
    Cause: Multiple Receipts: The planned order is linked to more than one receipt, which can happen due to various reasons, such as: Manual adjustments or changes in the planning process. Overlapping production or procurement processes. Incorrect configuration in the planning settings. Data Integrity Issues: There may be inconsistencies in the master data or transaction data that lead to multiple receipts being associated with a single planned order. Planning Parameters: The settings in the planning parameters may allow for multiple receipts to be created for a single planned order.
    Solution: Review Planned Order: Check the details of

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


/SAPAPO/SPPDRPSB040 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant