Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SOR -
Message number: 105
Message text: Start date of retention strategy group is &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SOR105
- Start date of retention strategy group is &1 ?The SAP error message
/SAPAPO/SOR105
typically indicates an issue related to the start date of a retention strategy group in the SAP Advanced Planning and Optimization (APO) module. This error can occur when the start date specified for a retention strategy group is either missing, invalid, or not aligned with the expected date format or business rules.Cause:
- Invalid Date: The start date provided for the retention strategy group may not be in the correct format or may not be a valid date.
- Missing Date: The start date might not have been entered at all, leading to the error.
- Business Rules Violation: The date may not comply with the business rules defined in the system, such as being in the past or outside of the allowed range.
- Configuration Issues: There may be issues with the configuration of the retention strategy group itself.
Solution:
- Check the Date Format: Ensure that the start date is entered in the correct format as expected by the system (e.g., YYYY-MM-DD).
- Enter a Valid Date: If the start date is missing or invalid, provide a valid start date that complies with the business rules.
- Review Business Rules: Check the business rules related to retention strategy groups to ensure that the date aligns with the expected parameters.
- Configuration Review: If the issue persists, review the configuration settings for the retention strategy group in the APO system to ensure everything is set up correctly.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on retention strategy groups and their configuration.
Related Information:
/SAPAPO/RSR
(Retention Strategy) to access and modify retention strategy groups.By following these steps, you should be able to identify and resolve the issue related to the /SAPAPO/SOR105
error message.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SOR104
Percentage for safety stock is &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SOR103
Cumulated demand over retention horzion is &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SOR106
RSG &2 (from entry location prod.) was selected for entry loc. &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SOR107
RSG &2 (from product data) was selected for entry locaction &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.