Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SNPOPT -
Message number: 150
Message text: Resource &1: Are costs for capacity increase ok?
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNPOPT150
- Resource &1: Are costs for capacity increase ok? ?The SAP error message
/SAPAPO/SNPOPT150 Resource &1: Are costs for capacity increase ok?
typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with capacity planning and optimization scenarios. This message indicates that there is a question regarding the costs associated with increasing the capacity of a resource.Cause:
- Capacity Increase Costs Not Defined: The system is prompting for confirmation or validation of the costs associated with increasing the capacity of a specific resource. This could happen if the costs for increasing capacity have not been defined in the system.
- Resource Configuration Issues: The resource in question may not be properly configured in terms of its capacity settings, leading to ambiguity in cost calculations.
- Planning Scenario Issues: The planning scenario may not have the necessary parameters set up correctly, leading to this error when trying to optimize or plan.
Solution:
Check Resource Configuration:
- Go to the resource master data in SAP APO and verify that the costs for capacity increase are defined correctly.
- Ensure that the resource is configured to allow for capacity increases and that the associated costs are specified.
Define Capacity Increase Costs:
- If the costs are not defined, you will need to enter the costs for increasing the capacity of the resource. This can typically be done in the resource master data under the relevant planning view.
Review Planning Parameters:
- Check the planning parameters and settings in the planning book or the relevant planning area to ensure that they are set up correctly to handle capacity increases.
Consult Documentation:
- Refer to the SAP documentation or help resources for specific instructions on how to set up capacity increase costs for resources in your version of SAP APO.
Testing:
- After making the necessary changes, run a test scenario to ensure that the error does not reoccur and that the system behaves as expected.
Related Information:
/SAPAPO/RRP3
(Product View) or /SAPAPO/RES01
(Resource Overview) to access the relevant data.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP APO for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SNPOPT149
Production process model/PDS &1 at location &2: Are costs ok?
What causes this issue? You modeled the costs for executing PPM &V1& at location &V2& with a piecewise linear cost function, but sele...
/SAPAPO/SNPOPT148
Product &1 at transportation lane &2: Are transportation costs ok?
What causes this issue? You used a piecewise linear function to model the costs for transporting product &V1& on transportation lane &V2&...
/SAPAPO/SNPOPT151
Product &1 at location &2: External procurement cost function incomplete
What causes this issue? The piecewise linear cost function to procure product &V1& externally at location &V2& has been defined for a...
/SAPAPO/SNPOPT152
Product &1 at transportation lane &2: Incomplete transportn cost function
What causes this issue? The piecewise linear cost function for transporting product &V1& on transportation lane &V2& was only defined...
Click on this link to search all SAP messages.