Message type: E = Error
Message class: /SAPAPO/SNPOPT -
Message number: 149
Message text: Production process model/PDS &1 at location &2: Are costs ok?
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNPOPT149
- Production process model/PDS &1 at location &2: Are costs ok? ?The SAP error message
/SAPAPO/SNPOPT149
typically relates to issues with the Production Data Structure (PDS) in the Advanced Planning and Optimization (APO) module of SAP. This error indicates that there may be a problem with the cost settings for a specific production process model at a given location.Cause:
- Costing Configuration: The error may arise if the costing configuration for the production process model (PDS) is not set up correctly. This could include missing or incorrect cost elements, cost estimates, or pricing conditions.
- PDS Inconsistencies: There may be inconsistencies or missing data in the PDS that prevent the system from calculating costs correctly.
- Master Data Issues: Problems with master data related to materials, resources, or production versions can also lead to this error.
- Location-Specific Settings: The error may be specific to the location indicated in the message, meaning that the settings for that location may not be properly configured.
Solution:
- Check Costing Configuration: Review the costing configuration for the production process model. Ensure that all necessary cost elements and cost estimates are defined and correctly assigned.
- Validate PDS: Use transaction
/SAPAPO/PDS
to check the PDS for the specified production process model and location. Look for any inconsistencies or missing data that need to be addressed.- Review Master Data: Ensure that all relevant master data (materials, resources, etc.) is correctly maintained and that there are no discrepancies.
- Location Settings: Check the settings specific to the location mentioned in the error message. Ensure that all necessary configurations are in place.
- Costing Run: If applicable, perform a costing run to recalculate costs and ensure that they are up to date.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the error message and related configurations.
Related Information:
/SAPAPO/PDS
, /SAPAPO/MC
, and others that may help in analyzing and resolving the issue.By following these steps, you should be able to identify and resolve the underlying cause of the error message /SAPAPO/SNPOPT149
.
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/SNPOPT148
Product &1 at transportation lane &2: Are transportation costs ok?
What causes this issue? You used a piecewise linear function to model the costs for transporting product &V1& on transportation lane &V2&...
/SAPAPO/SNPOPT147
Product &1 at location &2: Are costs for external procurement ok?
What causes this issue? You modeled the costs for external procurement of product &V1& at location &V2& using a piecewise linear func...
/SAPAPO/SNPOPT150
Resource &1: Are costs for capacity increase ok?
What causes this issue? You modeled the costs for increasing the capacity of resource &V1& using a piecewise linear cost function, but select...
/SAPAPO/SNPOPT151
Product &1 at location &2: External procurement cost function incomplete
What causes this issue? The piecewise linear cost function to procure product &V1& externally at location &V2& has been defined for a...