Message type: E = Error
Message class: /SAPAPO/SNP -
Message number: 422
Message text: Backwards scheduling in period &2 ended due to productn horizn (&1 days)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNP422
- Backwards scheduling in period &2 ended due to productn horizn (&1 days) ?The SAP error message /SAPAPO/SNP422 indicates that backwards scheduling in a specific period has ended due to the production horizon being exceeded. This error typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, particularly in the Supply Network Planning (SNP) module.
Cause: Production Horizon Exceeded: The error arises when the scheduling process attempts to schedule production or procurement activities beyond the defined production horizon. The production horizon is a time frame within which planning and scheduling can occur, and it is set in the system configuration. Configuration Settings: The production horizon may be set too short for the planning requirements, leading to scheduling issues when trying to plan for periods that fall outside this horizon. Planning Parameters: The planning parameters for the product or location may not be aligned with the actual demand or supply requirements, causing the scheduling to extend beyond the allowed limits.
Solution: Adjust Production Horizon: Review and, if
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/SNP421
The resources selected have different dimensions: &1 &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNP420
Capacity leveling performed for the period from &1 to &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNP423
Order for material &2 could not be found in period &1
What causes this issue? A manufacturing order could not be found in period &V1(CI)&, (material &V2(CI)&, resource &V3(CI)&).S...
/SAPAPO/SNP424
Minimum lot size for product &2 > than the capacity in period &1
What causes this issue? The minimum lot size &V4(CI)& for product &V2(CI)& defined in the product master is greater than the capacity...
Click on this link to search all SAP messages.