Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SNP -
Message number: 420
Message text: Capacity leveling performed for the period from &1 to &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SNP420
- Capacity leveling performed for the period from &1 to &2 ?The SAP error message
/SAPAPO/SNP420
indicates that capacity leveling has been performed for a specific period, which is typically related to the Supply Network Planning (SNP) module in SAP Advanced Planning and Optimization (APO). This message is informational and usually indicates that the system has completed a capacity leveling process for the specified time frame.Cause:
- Capacity Leveling Process: The message is generated when the system has executed a capacity leveling run. This process is designed to balance the load on resources over a specified period to ensure that production capacities are utilized efficiently.
- Planning Run: It may occur as part of a planning run where the system is trying to optimize resource utilization based on demand and supply.
Solution:
- Review the Results: Check the results of the capacity leveling process to ensure that it has met your expectations. You can do this by reviewing the planning results in the SNP planning book or through the relevant transaction codes.
- Adjust Parameters: If the results are not satisfactory, consider adjusting the parameters for the capacity leveling process. This may include changing the planning horizon, resource availability, or other relevant settings.
- Re-run Capacity Leveling: If necessary, you can re-run the capacity leveling process with adjusted parameters to achieve a better balance of resource utilization.
- Monitor Capacity: Continuously monitor the capacity utilization and adjust your planning strategies as needed to avoid future issues.
Related Information:
/SAPAPO/SNP1
for SNP planning or /SAPAPO/CC01
for capacity planning.If you continue to experience issues or if the message is accompanied by other error messages, it may be beneficial to consult with your SAP support team or refer to SAP community forums for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SNP419
No authorization for capacity leveling
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNP418
Error reading resource master data
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNP421
The resources selected have different dimensions: &1 &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SNP422
Backwards scheduling in period &2 ended due to productn horizn (&1 days)
What causes this issue? During backwards planning the production horizon (&V1& days) was reached. Planning could only be performed until peri...
Click on this link to search all SAP messages.