Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SEQ -
Message number: 544
Message text: Goods receipt processing time cannot be taken into account
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SEQ544
- Goods receipt processing time cannot be taken into account ?The SAP error message
/SAPAPO/SEQ544 Goods receipt processing time cannot be taken into account
typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with the goods receipt processing time in the planning process. This error can arise due to various reasons, and understanding the cause is essential for finding a solution.Cause:
- Missing or Incorrect Configuration: The goods receipt processing time may not be properly configured in the system. This could be due to missing entries in the relevant master data or configuration settings.
- Inconsistent Data: There may be inconsistencies in the data related to the product, location, or other relevant master data that affect the calculation of processing times.
- Planning Version Issues: The planning version being used may not have the correct settings or data related to goods receipt processing times.
- Time Period Issues: The time period for which the goods receipt processing time is being calculated may not be valid or may not align with the planning horizon.
Solution:
- Check Configuration: Review the configuration settings for goods receipt processing times in the APO system. Ensure that all necessary parameters are set correctly.
- Review Master Data: Check the master data for the relevant product and location. Ensure that the goods receipt processing time is defined and that there are no inconsistencies.
- Validate Planning Version: Ensure that the planning version being used has the correct settings and data. If necessary, switch to a different planning version that is known to be correct.
- Adjust Time Periods: Verify that the time periods being used for planning align with the goods receipt processing times. Adjust the planning horizon if needed.
- Consult Documentation: Refer to SAP documentation or notes related to this error message for any specific recommendations or patches that may address the issue.
Related Information:
/SAPAPO/SDP94
(for planning book) or /SAPAPO/MC90
(for master data) to help diagnose and resolve issues.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SEQ543
Time stream of resource &1 does not cover complete planning horizon
What causes this issue? The time stream of resource &V1& in the LiveCache does not cover the complete horizon. This means that the resource h...
/SAPAPO/SEQ542
Everything OK
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SEQ545
Reference calendar &1 inconsistent. Repair using TA /SAPAPO/CALENDAR.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SEQ550
No handling resource maintained in location &1
What causes this issue? You have maintained a <DS:DE./SAPAPO/GRPRT>goods receipt processing time</> for a location product in the <LS&...
Click on this link to search all SAP messages.