Message type: E = Error
Message class: /SAPAPO/SEQ -
Message number: 543
Message text: Time stream of resource &1 does not cover complete planning horizon
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SEQ543
- Time stream of resource &1 does not cover complete planning horizon ?The SAP error message /SAPAPO/SEQ543 indicates that the time stream of a resource does not cover the complete planning horizon for a given planning scenario in SAP Advanced Planning and Optimization (APO). This typically occurs when the resource's availability or capacity is not defined for the entire period that is being planned.
Cause: Incomplete Time Stream Definition: The resource's time stream may not have been defined for the entire planning horizon. This can happen if the resource is only available for certain periods and not for others. Planning Horizon Settings: The planning horizon set in the planning book or in the configuration may extend beyond the defined time stream of the resource. Resource Availability: The resource may have been set up with specific availability periods that do not align with the planning horizon.
Solution: Check Resource Time Stream: Go to the resource master data in SAP APO and check the time stream settings for the resource in
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/SEQ542
Everything OK
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SEQ541
Split (firmed) orders into lot sizes of one
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SEQ544
Goods receipt processing time cannot be taken into account
What causes this issue? Location &V1& contains no <DS:GLOS.D5AEE687AE33D311A11A0060B0673A17>Handling Resources</>.System Response...
/SAPAPO/SEQ545
Reference calendar &1 inconsistent. Repair using TA /SAPAPO/CALENDAR.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.