Message type: E = Error
Message class: /SAPAPO/SEQ -
Message number: 539
Message text: Individual procedure &1 not allowed for line nets with alternative lines
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SEQ539
- Individual procedure &1 not allowed for line nets with alternative lines ?The SAP error message /SAPAPO/SEQ539 indicates that there is an issue with the use of individual procedures in the context of line networks that contain alternative lines. This error typically arises in the Advanced Planning and Optimization (APO) module of SAP, particularly when dealing with production planning and scheduling.
Cause: The error occurs when you attempt to use an individual procedure (a specific set of rules or methods for processing) on a line network that includes alternative lines. In SAP APO, line networks are used to model production processes that can have multiple alternatives for certain operations. However, individual procedures are not compatible with these alternative lines, leading to this error.
Solution: To resolve this error, you can consider the following approaches: Review the Line Network Configuration: Check the configuration of the line network to ensure that it is set up correctly. If you are using alternative lines, you may need to adjust the procedures being
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/SEQ538
Error occurred when explosing the RPM
What causes this issue? An error occurred while trying to explode the Rapid Planning Matrix. The situation before starting the explosion has been ree...
/SAPAPO/SEQ537
No RPM explosion
What causes this issue? The Rapid Planning Matrix was not exploded as this corresponds to the settings in Customizing for Model Mix Planning.System R...
/SAPAPO/SEQ540
Reschedule (partially) backflushed orders
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SEQ541
Split (firmed) orders into lot sizes of one
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.