Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SEQ -
Message number: 537
Message text: No RPM explosion
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SEQ537
- No RPM explosion ?The SAP error message
/SAPAPO/SEQ537 No RPM explosion
typically occurs in the context of SAP Advanced Planning and Optimization (APO), particularly when dealing with the Demand Planning (DP) or Supply Network Planning (SNP) modules. This error indicates that the system was unable to perform a "RPM explosion" (Resource Planning Model explosion) for a specific planning object or scenario.Cause:
- Missing Master Data: The error can occur if the necessary master data (like product master, location master, or resource master) is not properly maintained or is missing.
- Incorrect Configuration: The configuration settings for the planning area or the planning object might not be set up correctly.
- Planning Object Not Found: The system may not find the relevant planning object in the database, which can happen if the object has been deleted or not created.
- Data Inconsistencies: There may be inconsistencies in the data that prevent the RPM explosion from being executed.
- Version Issues: The version of the planning book or the data being used may not be compatible with the RPM explosion process.
Solution:
- Check Master Data: Ensure that all necessary master data is correctly maintained. Verify that the product, location, and resource masters are complete and accurate.
- Review Configuration: Check the configuration settings for the planning area and ensure that they are set up correctly. This includes checking the settings for the planning book and the data view.
- Validate Planning Objects: Confirm that the planning objects you are trying to use exist in the system and have not been deleted or incorrectly configured.
- Data Consistency Check: Run consistency checks on the data to identify and resolve any inconsistencies that may be causing the error.
- Check Version Compatibility: Ensure that the version of the planning book or data you are using is compatible with the RPM explosion process.
- Consult SAP Notes: Look for relevant SAP Notes or documentation that may provide additional insights or patches related to this error.
Related Information:
/SAPAPO/DP
for Demand Planning or /SAPAPO/SNP
for Supply Network Planning to access the relevant planning areas and settings.If the problem persists after checking these areas, it may be beneficial to consult with your SAP Basis or APO support team for further investigation and resolution.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SEQ536
Invalid sequence of iPPE objects under &1
What causes this issue? In the factory structure, iPPE nodes are subordinate to the iPPE node &1 which are not in any linear sequence. For exampl...
/SAPAPO/SEQ535
Invalid adjustment period between periods &1 and &2
What causes this issue? An adjustment period is maintained between a horizon in which planned orders with lot size 1 are planned, and a horizon in wh...
/SAPAPO/SEQ538
Error occurred when explosing the RPM
What causes this issue? An error occurred while trying to explode the Rapid Planning Matrix. The situation before starting the explosion has been ree...
/SAPAPO/SEQ539
Individual procedure &1 not allowed for line nets with alternative lines
What causes this issue? An MMP run was started for a linenet with alternative lines. All single procedures included in the chosen procedure package m...
Click on this link to search all SAP messages.