Message type: E = Error
Message class: /SAPAPO/SEQ -
Message number: 521
Message text: Invalid planning basis sequence
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SEQ521
- Invalid planning basis sequence ?The SAP error message /SAPAPO/SEQ521 Invalid planning basis sequence typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is an issue with the planning sequence being used. This error indicates that the system cannot find a valid planning basis sequence for the operation you are trying to perform. Causes: Missing Planning Sequence: The specified planning sequence does not exist in the system. Incorrect Configuration: The planning sequence may not be correctly configured or activated in the system. Authorization Issues: The user may not have the necessary authorizations to access the planning sequence. Data Inconsistencies: There may be inconsistencies in the master data or transaction data that prevent the planning sequence from being recognized. Incorrect Input: The input parameters provided for the planning sequence may be incorrect or incomplete. Solutions: Check Planning Sequence: Verify that the planning sequence you are trying to use exists in the system. You can do this by navigating to the
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/SEQ520
Invalid reference calendar
What causes this issue? The reference calendar for the selected procedure package is blank or is not maintained for shifts or does not cover the comp...
/SAPAPO/SEQ519
RPM Explosion terminated by user
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SEQ522
Invalid planning basis for procedure &1
What causes this issue? You have chosen an invalid <DS:DE./SAPAPO/SEQ_PLANNING_BASIS>(Horizon) Planning basis</> for the procedure in the...
/SAPAPO/SEQ523
Evaluate procedure package
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.