Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SEQ -
Message number: 519
Message text: RPM Explosion terminated by user
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SEQ519
- RPM Explosion terminated by user ?The SAP error message
/SAPAPO/SEQ519 RPM Explosion terminated by user
typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, specifically during the process of running a planning sequence or a resource planning model (RPM). This error indicates that the execution of the planning sequence was manually terminated by the user.Cause:
- User Intervention: The most straightforward cause is that the user manually stopped the execution of the planning sequence. This could be due to various reasons, such as realizing that the sequence was not needed, or it was taking too long to execute.
- Long Execution Time: If the planning sequence takes an unusually long time to complete, users may decide to terminate it.
- Resource Constraints: The system may be under heavy load, causing delays that lead users to stop the process.
- Incorrect Configuration: There may be issues with the configuration of the planning sequence that cause it to run inefficiently.
Solution:
- Review Execution: If the termination was unintentional, review the planning sequence and its parameters to ensure it is set up correctly.
- Optimize Performance: If the sequence is taking too long, consider optimizing the planning sequence. This could involve:
- Reducing the amount of data being processed.
- Adjusting the planning parameters to improve performance.
- Ensuring that the system has adequate resources (CPU, memory) to handle the workload.
- Check Logs: Review the logs for any additional error messages or warnings that might provide insight into why the sequence was terminated.
- User Training: If users are frequently terminating the sequence, consider providing training on how to monitor and manage long-running processes effectively.
- System Monitoring: Implement monitoring tools to keep track of system performance and resource usage, which can help identify bottlenecks.
Related Information:
/SAPAPO/SEQ
for managing planning sequences.If the issue persists or if you need further assistance, consider reaching out to your SAP support team or consulting with an SAP expert who specializes in APO.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SEQ518
&1 RPM start explosion
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SEQ517
Save &1 result from horizon
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SEQ520
Invalid reference calendar
What causes this issue? The reference calendar for the selected procedure package is blank or is not maintained for shifts or does not cover the comp...
/SAPAPO/SEQ521
Invalid planning basis sequence
What causes this issue? In the procedure package that you have used, there is an invalid sequence of <DS:DE./SAPAPO/SEQ_PLANNING_BASIS>planning...
Click on this link to search all SAP messages.