Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SEQ -
Message number: 148
Message text: Resource &1 has no takt at &2 in shift &3
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SEQ148
- Resource &1 has no takt at &2 in shift &3 ?The SAP error message
/SAPAPO/SEQ148 Resource &1 has no takt at &2 in shift &3
typically occurs in the context of Advanced Planning and Optimization (APO) when dealing with production planning and scheduling. This error indicates that a specific resource (e.g., a machine or work center) does not have a defined takt time for the specified product at a given location and shift.Cause:
- Missing Takt Time: The primary cause of this error is that the resource specified in the error message does not have a takt time defined for the product at the specified location and shift.
- Configuration Issues: There may be issues in the configuration of the resource or the product master data, leading to the absence of the required takt time.
- Shift Definition: The shift definition for the resource may not be correctly set up, or the shift may not be active for the specified time period.
Solution:
Define Takt Time:
- Go to the resource master data in the SAP system.
- Check the settings for the resource (transaction code:
/SAPAPO/RRP3
or similar).- Ensure that a valid takt time is defined for the product at the specified location and shift.
Check Shift Settings:
- Verify the shift definitions in the system (transaction code:
/SAPAPO/SHIFTS
).- Ensure that the shift is correctly defined and active for the time period in question.
Review Product Master Data:
- Check the product master data to ensure that all necessary parameters, including the takt time, are correctly set up.
- Use transaction code:
/SAPAPO/MDP1
to review and maintain product data.Consult Documentation: If the issue persists, consult the SAP documentation or help resources for further guidance on configuring resources and takt times.
Testing: After making the necessary changes, test the planning run again to ensure that the error is resolved.
Related Information:
If you continue to experience issues after following these steps, it may be beneficial to engage with your SAP support team or consult with an SAP expert for more in-depth troubleshooting.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SEQ147
Planning basis: &1, &2
What causes this issue? The <DS:DE./SAPAPO/SEQ_PLANNING_BASIS>planning basis</> determines which requirements are included in the Model M...
/SAPAPO/SEQ146
Cannot determine a source of supply for product & and location &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SEQ149
Invalid model mix line
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SEQ150
Resource data invalid. Line resource &1
What causes this issue? This message can have the following causes: No capacity variant is defined for the line resource. The shift sequence in the c...
Click on this link to search all SAP messages.