Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SEQ -
Message number: 147
Message text: Planning basis: &1, &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SEQ147
- Planning basis: &1, &2 ?The SAP error message
/SAPAPO/SEQ147 Planning basis: &1, &2
typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is an issue related to the planning basis in the system. This error message indicates that there is a problem with the planning basis that is being used for a particular planning run or operation.Cause:
- Invalid Planning Basis: The planning basis specified may not be valid or may not exist in the system.
- Configuration Issues: There may be configuration issues in the APO system related to the planning area or planning book.
- Data Inconsistencies: There could be inconsistencies in the master data or transaction data that are affecting the planning basis.
- Missing Data: Required data for the planning basis may be missing or incomplete.
Solution:
- Check Planning Basis: Verify that the planning basis specified in the error message is valid. Check the configuration in the planning area and ensure that the planning basis exists.
- Review Configuration: Go to the configuration settings in the APO system and ensure that the planning area and planning book are correctly set up.
- Data Consistency Check: Perform a consistency check on the master data and transaction data to identify any inconsistencies that may be causing the issue.
- Update Missing Data: If any required data is missing, update it accordingly to ensure that the planning basis can be processed correctly.
- Consult Documentation: Refer to SAP documentation or notes related to the specific planning basis and error message for additional guidance.
Related Information:
/SAPAPO/SDP94
(for planning book) or /SAPAPO/MC62
(for planning area) to check the configuration.By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SEQ146
Cannot determine a source of supply for product & and location &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SEQ145
Order/requirement volume is &1 &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SEQ148
Resource &1 has no takt at &2 in shift &3
What causes this issue? The resource has no takt in the specified shift as the takt time is graeter than the available time in the shift. In Model Mi...
/SAPAPO/SEQ149
Invalid model mix line
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.