How To Fix /SAPAPO/SEQ053 - Optimization not possible because of hard weighting(s)


/SAPAPO/SEQ053 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/SEQ -

  • Message number: 053

  • Message text: Optimization not possible because of hard weighting(s)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/SEQ053 - Optimization not possible because of hard weighting(s) ?
    The SAP error message /SAPAPO/SEQ053 indicates that the optimization process in SAP Advanced Planning and Optimization (APO) cannot be completed due to the presence of hard weighting constraints. This typically occurs in the context of supply chain planning, where certain constraints or requirements are defined as "hard" and cannot be violated during the optimization process.
    
    Cause: Hard Constraints: The error arises when there are hard constraints defined in the planning model that cannot be satisfied given the current data or configuration. These constraints might include: Capacity limitations (e.g., production capacity, storage capacity). Demand requirements that must be met without exception. Specific resource allocations that are mandatory. Infeasible Problem: The combination of hard constraints and the current state of the planning data may lead to an infeasible optimization problem, meaning that there is no possible solution that satisfies all constraints. Data Issues: Incorrect or incomplete master data, such as product availability, resource capacities, or demand forecasts, can also

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker