Message type: E = Error
Message class: /SAPAPO/SEQ -
Message number: 054
Message text: A result that is not optimal has been transferred to planning
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SEQ054
- A result that is not optimal has been transferred to planning ?The SAP error message /SAPAPO/SEQ054 indicates that a result that is not optimal has been transferred to planning in the context of SAP Advanced Planning and Optimization (APO). This message typically arises during the planning process when the system identifies that the results generated by the planning run do not meet the optimal criteria defined in the planning settings. Causes: Suboptimal Planning Parameters: The planning parameters or heuristics used may not be configured correctly, leading to suboptimal results. Data Issues: Incomplete or incorrect master data (e.g., material master, location data) can lead to inefficient planning outcomes. Capacity Constraints: If there are capacity constraints that are not properly defined or are too restrictive, the planning run may not yield optimal results. Demand and Supply Mismatch: A significant mismatch between demand and supply can lead to suboptimal planning results. Heuristic Limitations: The heuristic or algorithm used for planning may not be suitable for the specific scenario or data
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/SEQ053
Optimization not possible because of hard weighting(s)
What causes this issue? You cannot optimize the currently selected order sequence as One or several restrictions with hard weighting(s) would be viol...
/SAPAPO/SEQ052
Optimized order items: &1, firmed orders: &2
What causes this issue? Message about the quantity of orders dealt with by the genetic algorithm.System Response The system issues an error message ...
/SAPAPO/SEQ055
Optimization terminated due to inconsistencies. See log
What causes this issue? The optimization run discovered an inconsistency.System Response The optimization was terminated. No data changes were carri...
/SAPAPO/SEQ056
Optimum Solution Found
What causes this issue? The optimization algorithm has found an optimal solution.System Response The system issues an error message and will not all...
Click on this link to search all SAP messages.