Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/SCHED_CND -
Message number: 806
Message text: Enter a date/time under &1 that is earlier than that under &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/SCHED_CND806
- Enter a date/time under &1 that is earlier than that under &2 ?The SAP error message
/SAPAPO/SCHED_CND806
indicates that there is a date/time conflict in the scheduling conditions within the Advanced Planning and Optimization (APO) module. Specifically, it means that the date/time entered in one field (denoted as &1) is later than the date/time in another field (denoted as &2), which is not allowed.Cause:
This error typically occurs in scenarios where:
To resolve this error, you can take the following steps:
Check Date/Time Entries: Review the date and time values you have entered for both fields. Ensure that the date/time in field &1 (the earlier date/time) is indeed earlier than the date/time in field &2 (the later date/time).
Correct the Values: If you find that the values are incorrect, update them accordingly. Make sure that the start date/time is before the end date/time.
Review Scheduling Conditions: If this error arises from a scheduling condition setup, review the entire configuration to ensure that all conditions are logically consistent.
Consult Documentation: If you are unsure about the correct values or the configuration, refer to the SAP documentation or help resources related to scheduling in APO.
Test Changes: After making corrections, test the changes to ensure that the error no longer occurs.
Seek Help: If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more specific guidance based on your system configuration.
/SAPAPO/SCM
for supply chain management or /SAPAPO/SDP94
for planning board.By following these steps, you should be able to identify and correct the cause of the error message /SAPAPO/SCHED_CND806
.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/SCHED_CND805
No properties could be determined
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SCHED_CND804
Specify a logical system, order number and item number
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SCHED_CND807
Condition type list &1 for application &2, use &3 does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/SCHED_CND808
Properties do not exist in determination procedure &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.