How To Fix /SAPAPO/S2L105 - Some requirements were not taken into account


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/S2L -

  • Message number: 105

  • Message text: Some requirements were not taken into account

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/S2L105 - Some requirements were not taken into account ?

    The SAP error message /SAPAPO/S2L105 Some requirements were not taken into account typically occurs in the context of Advanced Planning and Optimization (APO) when the system is unable to fulfill all the requirements during the planning process. This can happen for various reasons, and understanding the cause is crucial for finding an appropriate solution.

    Causes:

    1. Capacity Constraints: The production or resource capacity may be insufficient to meet all the requirements. This can happen if the planned orders exceed the available capacity of the resources.

    2. Planning Parameters: Incorrect or suboptimal planning parameters (like lot sizes, safety stock levels, or lead times) can lead to situations where not all requirements can be satisfied.

    3. Product Availability: If there are issues with product availability (e.g., stock shortages, incorrect stock levels), some requirements may not be fulfilled.

    4. Demand and Supply Mismatch: A significant mismatch between demand and supply can lead to some requirements being ignored during the planning run.

    5. Planning Version: The planning version being used may not have the necessary data or may be outdated, leading to incorrect planning results.

    6. Master Data Issues: Problems with master data (like incorrect BOMs, routing, or resource definitions) can also lead to this error.

    Solutions:

    1. Check Capacity: Review the capacity of the resources involved in the planning process. Ensure that the available capacity is sufficient to meet the planned orders.

    2. Adjust Planning Parameters: Revisit the planning parameters and adjust them as necessary. This may include modifying lot sizes, safety stock levels, or lead times.

    3. Review Stock Levels: Check the stock levels of the products involved. Ensure that there is enough stock to meet the requirements.

    4. Analyze Demand and Supply: Conduct a thorough analysis of demand and supply to identify any significant mismatches. Adjust forecasts or supply plans accordingly.

    5. Update Planning Version: Ensure that you are using the correct and most up-to-date planning version. If necessary, create a new version with the latest data.

    6. Correct Master Data: Review and correct any issues with master data, including BOMs, routing, and resource definitions.

    7. Run Planning Again: After making the necessary adjustments, run the planning process again to see if the requirements can now be fulfilled.

    Related Information:

    • Transaction Codes: You may want to use transaction codes like /SAPAPO/SDP94 (for demand planning) or /SAPAPO/MC90 (for capacity planning) to analyze the situation further.
    • SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.
    • Documentation: Refer to SAP documentation for APO to understand the planning process better and how to configure it correctly.

    By systematically addressing the potential causes and implementing the suggested solutions, you should be able to resolve the error message and ensure that all requirements are taken into account during the planning process.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker