Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/S2L -
Message number: 104
Message text: No exact stock per takt possible as synchonization RP missing
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/S2L104
- No exact stock per takt possible as synchonization RP missing ?The SAP error message
/SAPAPO/S2L104 No exact stock per takt possible as synchronization RP missing
typically occurs in the context of Advanced Planning and Optimization (APO) within SAP, particularly when dealing with production planning and scheduling. This error indicates that the system is unable to find a suitable stock level that matches the required takt time due to a missing synchronization resource planning (RP) entry.Cause:
- Missing Synchronization Resource Planning (RP): The error suggests that there is a missing synchronization RP that is necessary for the system to calculate the exact stock levels required to meet the takt time.
- Incorrect Configuration: There may be issues with the configuration of the production process, such as incorrect settings in the planning book or data inconsistencies.
- Data Inconsistencies: There could be inconsistencies in the master data, such as product master, location master, or resource master data.
- Planning Version Issues: The planning version being used may not have the necessary data or settings configured.
Solution:
- Check Synchronization RP: Ensure that the synchronization resource planning (RP) is correctly defined and available in the system. You may need to create or adjust the RP settings in the APO system.
- Review Configuration Settings: Verify the configuration settings related to production planning and scheduling. Ensure that all necessary parameters are set correctly.
- Validate Master Data: Check the master data for the products, resources, and locations involved in the planning process. Ensure that all relevant data is complete and accurate.
- Use Correct Planning Version: Make sure that you are using the correct planning version that contains the necessary data for the planning process.
- Run Planning Functions: If applicable, run the relevant planning functions (e.g., heuristic, optimizer) to regenerate the planning data and ensure that the system has the latest information.
- Consult Documentation: Refer to SAP documentation or notes related to this specific error message for additional troubleshooting steps or patches that may be available.
Related Information:
/SAPAPO/MC90
for planning book configuration or /SAPAPO/SDP94
for checking the planning results.If the issue persists after following these steps, it may be beneficial to consult with an SAP expert or your organization's SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/S2L103
No exact stock per takt possible as serialization RP missing
What causes this issue? No exact stock per takt can be calculated for the supply segment as the <DS:DE.PPE_SER_RP>serialization reporting point...
/SAPAPO/S2L102
No exact stock per takt as order with lot size > 1
What causes this issue? No exact stock per takt can be calculated for the supply segment as not all orders in the supply segment have a lot size equa...
/SAPAPO/S2L105
Some requirements were not taken into account
What causes this issue? There are several reasons causing this situation: The supply segment lies in a multiple work center. In the planning horizon,...
/SAPAPO/S2L106
No exact stocks per takt currently possible
What causes this issue? Significant changes have been made to the line structure. At the corresponding supply segment, relevant orders exist which we...
Click on this link to search all SAP messages.