Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RSP -
Message number: 608
Message text: End date & is later than the end date of the last period & (see longtext)
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RSP608
- End date & is later than the end date of the last period & (see longtext) ?The SAP error message
/SAPAPO/RSP608
typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is a mismatch in the date settings for planning periods. Specifically, this error indicates that the end date specified for a planning period is later than the end date of the last defined period in the planning book or the planning area.Cause:
- Incorrect Date Configuration: The end date you are trying to set for a planning period exceeds the end date of the last defined period in the planning area.
- Planning Book Settings: The planning book may have been configured with a specific range of dates, and the new end date does not align with this configuration.
- Master Data Issues: There may be inconsistencies in the master data that define the periods and their respective dates.
Solution:
- Check Planning Periods: Review the planning periods defined in your planning area or planning book. Ensure that the end date you are trying to set does not exceed the last defined period's end date.
- Adjust Dates: If necessary, adjust the end date of the planning period you are trying to create or modify to ensure it falls within the defined range.
- Review Configuration: Go to the configuration settings of the planning area or planning book and verify the date settings. Make sure that the periods are correctly defined and that there are no overlaps or gaps.
- Consult Long Text: The error message suggests checking the long text for more details. You can do this by navigating to the error message in the SAP GUI and viewing the long text for additional context or specific instructions.
- Master Data Consistency: Ensure that all relevant master data (like time series data) is consistent and correctly set up to avoid conflicts with the planning periods.
Related Information:
/SAPAPO/MC62
(for planning book maintenance) or /SAPAPO/MC73
(for planning area maintenance) to review and adjust your settings.By following these steps, you should be able to resolve the error and ensure that your planning periods are correctly configured.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RSP607
No period start date exists for the restriction start date
What causes this issue? A period start must exist in the planning calendar (time stream ID) for each start date of a restriction. The start date <...
/SAPAPO/RSP606
No valid periods exist in planning calendar (time stream ID) &1; &2 &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RSP609
Start date & is earlier than the start of restriction & (see longtext)
What causes this issue? The start date of the checking horizon may not lie before the start of the restriction. However, the start date of checking h...
/SAPAPO/RSP610
Start date is before the restr. start date due to offset (see long text)
What causes this issue? The start date of the checking horizon, which is moved as a result of the offset, may not lie before the start date of the re...
Click on this link to search all SAP messages.