How To Fix /SAPAPO/RRP_PT011 - Finish date precedes start date. Correct the entry


/SAPAPO/RRP_PT011 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_PT -

  • Message number: 011

  • Message text: Finish date precedes start date. Correct the entry

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_PT011 - Finish date precedes start date. Correct the entry ?
    The SAP error message /SAPAPO/RRP_PT011 Finish date precedes start date. Correct the entry typically occurs in the context of SAP Advanced Planning and Optimization (APO) when there is a scheduling issue with a production order, planned order, or any other activity that involves start and finish dates.
    
    Cause: This error indicates that the finish date of a task or order is set to an earlier date than its start date. This can happen due to: Incorrect Data Entry: The user may have mistakenly entered the finish date before the start date. System
    Configuration Issues: There may be issues with the configuration of the planning parameters or settings that lead to incorrect date calculations. Data Migration Issues: If data has been migrated from another system, there may be inconsistencies in the date fields. Changes in Planning Parameters: Changes in lead times or other planning parameters can affect the scheduling of orders.
    Solution: To resolve this error, you can take

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker