How To Fix /SAPAPO/RRP_PT009 - The start date lies more than 30 days in the past


/SAPAPO/RRP_PT009 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_PT -

  • Message number: 009

  • Message text: The start date lies more than 30 days in the past

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_PT009 - The start date lies more than 30 days in the past ?
    The SAP error message /SAPAPO/RRP_PT009 indicates that the start date specified for a planning or scheduling operation lies more than 30 days in the past. This error typically occurs in the context of Advanced Planning and Optimization (APO) when trying to execute a planning run or when working with the production planning and detailed scheduling (PP/DS) functionalities.
    
    Cause: The primary cause of this error is that the system has a restriction on how far back in time you can plan or schedule activities. The 30-day limit is often set to ensure that planning is focused on the near future, which is more relevant for operational decision-making. Planning too far back can lead to inaccuracies and inefficiencies in the planning process.
    Solution: To resolve this error, you can consider the following approaches: Adjust the Start Date: Change the start date of your planning run or scheduling operation to be within the last 30 days or in

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker