Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_PT -
Message number: 009
Message text: The start date lies more than 30 days in the past
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_PT009
- The start date lies more than 30 days in the past ?The SAP error message
/SAPAPO/RRP_PT009
indicates that the start date specified for a planning or scheduling operation lies more than 30 days in the past. This error typically occurs in the context of Advanced Planning and Optimization (APO) when trying to execute a planning run or when working with the production planning and detailed scheduling (PP/DS) functionalities.Cause:
The primary cause of this error is that the system has a restriction on how far back in time you can plan or schedule activities. The 30-day limit is often set to ensure that planning is focused on the near future, which is more relevant for operational decision-making. Planning too far back can lead to inaccuracies and inefficiencies in the planning process.
Solution:
To resolve this error, you can consider the following approaches:
Adjust the Start Date: Change the start date of your planning run or scheduling operation to be within the last 30 days or in the future. Ensure that the date you are trying to use is within the acceptable range.
Review Planning Parameters: Check the planning parameters and settings in your APO system. There may be configuration settings that define the allowable planning horizon. If necessary, consult with your SAP Basis or APO configuration team to adjust these settings.
Use Historical Data: If you need to analyze historical data, consider using reporting tools or queries that allow you to access historical information without triggering planning runs.
Consult Documentation: Review the SAP documentation or help files related to the specific transaction or planning function you are using. There may be additional context or configuration options that can help you understand the limitations.
Contact SAP Support: If you believe that the error is occurring inappropriately or if you need to change the system's behavior, consider reaching out to SAP support for assistance. They can provide guidance based on your specific system configuration and requirements.
Related Information:
/SAPAPO/RRP
for planning board or /SAPAPO/SDP
for supply network planning.By following these steps, you should be able to address the error and continue with your planning activities in SAP APO.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_PT008
*** Comment *** Messages for accessing the planning table
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT006
LiveCache error
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT010
Period of examination is greater than 2 years --> performance
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_PT011
Finish date precedes start date. Correct the entry
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.