Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_HEUR -
Message number: 410
Message text: No planned independent requirements were found
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_HEUR410
- No planned independent requirements were found ?The SAP error message
/SAPAPO/RRP_HEUR410 No planned independent requirements were found
typically occurs in the context of Advanced Planning and Optimization (APO) when running heuristics or planning runs. This message indicates that the system did not find any planned independent requirements (PIRs) for the product or location you are trying to plan.Causes:
- No Planned Independent Requirements: The most straightforward cause is that there are no PIRs defined for the product in the planning horizon you are working with.
- Incorrect Planning Version: The planning version you are using may not have any PIRs defined.
- Incorrect Product or Location: The product or location you are trying to plan may not have been set up correctly in the system.
- Planning Horizon Issues: The planning horizon may not include the periods where PIRs are defined.
- Data Transfer Issues: There may have been issues in transferring data from the ERP system to APO, leading to missing PIRs.
Solutions:
Check Planned Independent Requirements:
- Go to the transaction
/SAPAPO/SDP94
(or similar) to check if there are any PIRs defined for the product and location in question.- If there are no PIRs, you will need to create them.
Verify Planning Version:
- Ensure that you are using the correct planning version that contains the necessary PIRs.
- You can check this in the planning book or by using the transaction
/SAPAPO/SDP94
.Review Product and Location Setup:
- Confirm that the product and location are correctly set up in the system.
- Check the master data for the product to ensure it is active and correctly configured.
Adjust Planning Horizon:
- Make sure that the planning horizon you are working with includes the periods where PIRs are defined.
- You can adjust the planning horizon in the planning book settings.
Data Transfer Check:
- If you suspect data transfer issues, check the data transfer logs to ensure that PIRs have been successfully transferred from the ERP system to APO.
- You may need to re-run the data transfer if there are discrepancies.
Consult Documentation:
- Review SAP documentation or notes related to this error message for any additional insights or specific configurations that may be required.
Related Information:
/SAPAPO/SDP94
for viewing PIRs, /SAPAPO/MC90
for checking planning versions, and /SAPAPO/OM17
for checking master data.By following these steps, you should be able to identify the cause of the error and implement the necessary solutions to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_HEUR403
A supplier does not exist for the product location
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR402
Requirements planning completed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR411
No products with make-to-stock production available
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR500
Error when calculating time period outside the PP/DS horizon
What causes this issue? Due to an error, the heuristic was not able to calculate the period outside the <DS:GLOS.123C87C4AE4AD511AE750800062AFB0F&...
Click on this link to search all SAP messages.