Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_HEUR -
Message number: 402
Message text: Requirements planning completed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_HEUR402
- Requirements planning completed ?The SAP error message
/SAPAPO/RRP_HEUR402 Requirements planning completed
typically indicates that the requirements planning process in SAP Advanced Planning and Optimization (APO) has been completed successfully. However, it may also imply that there were issues or warnings during the planning run that need to be addressed.Cause:
- Planning Run Completion: The message indicates that the planning run has finished, but it may not necessarily mean that all requirements were met or that there were no issues.
- Warnings or Errors: There could be warnings or errors logged during the planning process that need to be reviewed. This could be due to insufficient stock, capacity issues, or other planning constraints.
- Configuration Issues: There may be configuration settings in the APO system that are not aligned with the business requirements, leading to incomplete or suboptimal planning results.
Solution:
- Review Logs: Check the planning run logs for any warnings or errors that were generated during the process. This can provide insights into what went wrong or what needs to be addressed.
- Analyze Requirements: Look into the specific requirements that were planned. Ensure that the demand and supply data are accurate and that there are no discrepancies.
- Adjust Parameters: If necessary, adjust the planning parameters or heuristics used in the planning run to better align with business needs.
- Check Master Data: Ensure that all relevant master data (e.g., material master, resource master, etc.) is correctly maintained and up to date.
- Run Planning Again: After addressing any identified issues, you may need to rerun the planning process to see if the results improve.
Related Information:
/SAPAPO/RRP3
to view the results of the planning run and analyze the requirements.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a consultant who specializes in SAP APO for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_HEUR401
No demands exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR400
No requirements planning: requirements elements < receipt elements
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR403
A supplier does not exist for the product location
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR410
No planned independent requirements were found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...