Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_HEUR -
Message number: 246
Message text: Incorrect date for receipt or requirement
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_HEUR246
- Incorrect date for receipt or requirement ?The SAP error message
/SAPAPO/RRP_HEUR246 Incorrect date for receipt or requirement
typically occurs in the context of Advanced Planning and Optimization (APO) when there is an inconsistency in the dates associated with receipts or requirements in the planning process. This error can arise due to various reasons, including:Causes:
- Date Mismatch: The receipt or requirement date may be set in the past or may not align with the planning horizon.
- Incorrect Configuration: The planning parameters or settings may not be correctly configured, leading to discrepancies in date calculations.
- Data Integrity Issues: There may be issues with master data or transaction data that lead to incorrect date entries.
- Planning Version Issues: The planning version being used may not be correctly set up or may have inconsistencies.
Solutions:
- Check Dates: Review the dates for the receipts and requirements in the relevant planning books or transactions. Ensure that they are set correctly and fall within the valid planning horizon.
- Adjust Planning Parameters: Verify the planning parameters in the APO system. Ensure that the settings for lead times, safety stock, and other relevant parameters are correctly configured.
- Data Consistency Check: Perform a consistency check on the master data and transaction data. Look for any anomalies or incorrect entries that could be causing the issue.
- Review Planning Versions: Ensure that the correct planning version is being used and that it is properly configured. If necessary, create a new planning version or adjust the existing one.
- Run Heuristic Again: After making the necessary adjustments, rerun the heuristic or planning run to see if the error persists.
Related Information:
/SAPAPO/RRP3
(Product View) or /SAPAPO/RRP4
(Order View) to analyze the receipts and requirements.If the issue persists after trying the above solutions, it may be beneficial to consult with your SAP support team or refer to SAP community forums for further assistance.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_HEUR245
Error when determining the period for storage/penalty costs
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR243
No cost function for product &1 and transportation lane &2 --> &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR248
Order &1 with invalid source of supply
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR251
Maintain the destinations for parallel processing
What causes this issue? You have selected that you would like to use parallel processing for the planning run but you have not yet maintained the des...
Click on this link to search all SAP messages.