How To Fix /SAPAPO/RRP_HEUR245 - Error when determining the period for storage/penalty costs


/SAPAPO/RRP_HEUR245 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_HEUR -

  • Message number: 245

  • Message text: Error when determining the period for storage/penalty costs

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_HEUR245 - Error when determining the period for storage/penalty costs ?
    The SAP error message /SAPAPO/RRP_HEUR245 typically occurs in the context of Advanced Planning and Optimization (APO) when the system is unable to determine the period for storage or penalty costs during the planning process. This error can arise due to various reasons, including configuration issues, missing master data, or incorrect planning parameters.
    Causes:
    
    
    Missing Master Data: The relevant master data for the product, location, or resource may not be maintained correctly. This includes missing storage costs or penalty costs in the product master or location master.
    
    
    Incorrect Planning Parameters: The planning parameters set in the APO system may not be configured correctly, leading to issues in cost determination.
    
    
    Time Period Configuration: The time periods for which storage or penalty costs are defined may not align with the planning horizon or may be missing.
    
    
    Data Inconsistencies: There may be inconsistencies in the data, such as overlapping periods or gaps in the cost definitions.
    
    
    Version Issues: The planning

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant