Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP_HEUR -
Message number: 037
Message text: Resource &1 planned
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP_HEUR037
- Resource &1 planned ?The SAP error message
/SAPAPO/RRP_HEUR037 Resource &1 planned
typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue related to resource planning. This error indicates that a resource (denoted by&1
) is already planned for a certain time period, which can lead to conflicts or scheduling issues.Cause:
- Resource Overlap: The resource is already allocated to another production order or activity during the time frame you are trying to schedule.
- Capacity Constraints: The resource may have capacity constraints that prevent it from being used for additional planning.
- Incorrect Planning Parameters: The planning parameters or settings for the resource may not be configured correctly, leading to conflicts.
- Locked Resources: The resource might be locked due to another process or user, preventing it from being scheduled.
Solution:
- Check Resource Allocation: Review the current allocation of the resource in the planning book or resource view to see if it is already assigned to another order.
- Adjust Planning Parameters: Ensure that the planning parameters for the resource are set correctly. This includes checking the capacity, availability, and any other relevant settings.
- Reschedule Orders: If the resource is indeed busy, consider rescheduling the conflicting orders or activities to free up the resource.
- Release Locks: If the resource is locked, identify the process or user that has locked it and release the lock if appropriate.
- Capacity Planning: If the resource is consistently overbooked, consider increasing its capacity or adding additional resources to handle the demand.
Related Information:
/SAPAPO/RRP3
to view the resource planning and allocation details.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP_HEUR036
Product &1 scheduled in location &2 with account assignment object &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR035
Product &1 has characteristics and is not planned
What causes this issue? The product has <ZH><ZK>characteristics</></> and therefore cannot be planned with this heuristic.Sys...
/SAPAPO/RRP_HEUR038
Both, FIFO and Shelflife are active, see note 1608619
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP_HEUR040
Heuristic &1 does not process any products
What causes this issue? The algorithm used in the heuristic is not defined for use on products. In the table /SAPAPO/HEURFUNC, the planning focus of ...