How To Fix /SAPAPO/RRP_HEUR037 - Resource &1 planned


/SAPAPO/RRP_HEUR037 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_HEUR -

  • Message number: 037

  • Message text: Resource &1 planned

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_HEUR037 - Resource &1 planned ?
    The SAP error message /SAPAPO/RRP_HEUR037 Resource &1 planned typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue related to resource planning. This error indicates that a resource (denoted by &1) is already planned for a certain time period, which can lead to conflicts or scheduling issues.
    
    Cause: Resource Overlap: The resource is already allocated to another production order or activity during the time frame you are trying to schedule. Capacity Constraints: The resource may have capacity constraints that prevent it from being used for additional planning. Incorrect Planning Parameters: The planning parameters or settings for the resource may not be configured correctly, leading to conflicts. Locked Resources: The resource might be locked due to another process or user, preventing it from being scheduled.
    Solution: Check Resource Allocation: Review the current allocation of the resource in the planning book or resource view to see if it is already assigned to another

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant