How To Fix /SAPAPO/RRP_HEUR036 - Product &1 scheduled in location &2 with account assignment object &3


SAP Error Message - Details

  • Message type: E = Error

  • Message class: /SAPAPO/RRP_HEUR -

  • Message number: 036

  • Message text: Product &1 scheduled in location &2 with account assignment object &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP_HEUR036 - Product &1 scheduled in location &2 with account assignment object &3 ?

    The SAP error message /SAPAPO/RRP_HEUR036 typically indicates that there is an issue with the scheduling of a product in a specific location with a particular account assignment object in the Advanced Planning and Optimization (APO) module. This error can arise due to various reasons, including configuration issues, data inconsistencies, or missing master data.

    Cause:

    1. Missing Master Data: The product, location, or account assignment object may not be properly defined in the system.
    2. Planning Version Issues: The planning version being used may not be correctly set up or may not contain the necessary data.
    3. Resource Constraints: There may be constraints related to resources that prevent the scheduling of the product.
    4. Incorrect Settings: The settings for the product or location may not be configured correctly, leading to scheduling issues.
    5. Data Inconsistencies: There may be inconsistencies in the data related to the product, location, or account assignment object.

    Solution:

    1. Check Master Data: Ensure that the product, location, and account assignment object are correctly defined in the system. Verify that all necessary master data is available and correctly configured.
    2. Review Planning Version: Make sure that the planning version being used is active and contains the necessary data for the product and location.
    3. Analyze Resource Availability: Check if there are any resource constraints that might be affecting the scheduling. Ensure that resources are available for the planned production or distribution.
    4. Verify Settings: Review the settings for the product and location in the APO system. Ensure that all relevant parameters are correctly configured.
    5. Check for Data Inconsistencies: Run consistency checks in the system to identify and resolve any data inconsistencies that may be causing the error.
    6. Consult Logs and Traces: Look at the application logs and traces for more detailed information about the error. This can provide insights into what specifically is causing the issue.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like /SAPAPO/RRP3 (Product View) or /SAPAPO/RRP4 (Location View) to analyze the product and location data.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • Documentation: Refer to the SAP APO documentation for more information on planning and scheduling processes, as well as best practices for master data management.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or reach out to SAP support for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker