How To Fix /SAPAPO/RRP627 - Production order &1 has been rescheduled outside its validity


/SAPAPO/RRP627 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/RRP -

  • Message number: 627

  • Message text: Production order &1 has been rescheduled outside its validity

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/RRP627 - Production order &1 has been rescheduled outside its validity ?
    The SAP error message /SAPAPO/RRP627 Production order &1 has been rescheduled outside its validity typically occurs in the context of Advanced Planning and Optimization (APO) when a production order is being rescheduled, but the new schedule falls outside the validity period defined for that order. This can happen for various reasons, such as changes in demand, capacity constraints, or adjustments in the planning process.
    
    Cause: Validity Period: Each production order has a defined validity period during which it can be executed. If the rescheduling attempts to set a start or finish date outside this period, the error will occur. Planning Parameters: Changes in planning parameters or settings that affect the production order's scheduling can lead to this issue. Capacity Constraints: If there are capacity constraints or changes in resource availability, the system may attempt to reschedule the order in a way that violates its validity. Order Status: The status of the production order (e.g., if

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker