Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP -
Message number: 609
Message text: The SNP order was converted by changing the source in the PP/DS order
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP609
- The SNP order was converted by changing the source in the PP/DS order ?The SAP error message
/SAPAPO/RRP609
indicates that a Supply Network Planning (SNP) order was converted by changing the source in the Production Planning/Detailed Scheduling (PP/DS) order. This typically occurs when there is a mismatch or inconsistency in the planning data, particularly related to the source of supply for the order.Cause:
- Source of Supply Change: The error usually arises when the source of supply for a SNP order is changed during the conversion process to a PP/DS order. This can happen if the planning parameters or settings for the product or location have been modified.
- Master Data Issues: There may be inconsistencies in the master data, such as the material master, location master, or source list, which can lead to issues during the conversion.
- Planning Version Conflicts: If different planning versions are being used, it can lead to discrepancies in the source of supply.
- Capacity Constraints: If there are capacity constraints or issues with the production resources, the system may attempt to change the source of supply to accommodate the order.
Solution:
- Check Master Data: Review the master data for the material, including the source list, to ensure that the correct sources of supply are defined and that there are no inconsistencies.
- Review Planning Parameters: Check the planning parameters for the product and location to ensure they are set correctly and that there are no conflicting settings.
- Analyze the Order: Look at the specific SNP order that is causing the error. Check the details of the order to understand why the source was changed and whether it aligns with the intended planning strategy.
- Adjust Capacity Settings: If capacity constraints are causing the issue, consider adjusting the capacity settings for the production resources or re-evaluating the production schedule.
- Use the Correct Planning Version: Ensure that you are using the correct planning version and that all relevant data is consistent across versions.
- Consult SAP Notes: Check for any relevant SAP Notes or updates that may address this specific error or provide additional guidance.
Related Information:
/SAPAPO/RRP3
to analyze the order details or /SAPAPO/SDP94
for planning board analysis.By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP608
The following products are affected:
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RRP607
The SNP PPM &1 does not refer to a valid PP/DS PPM
What causes this issue? You want to convert an SNP planned order into a PP/DS planned order. Since you have set the <DS:DE./SAPAPO/USE_SNP_SOURCE&...
/SAPAPO/RRP610
SNP plan &1 has no valid modes
What causes this issue? You want to convert a <LS>Supply Network Planning</>(SNP) in-house production order into a <LS>Production P...
/SAPAPO/RRP611
Source of supply &2 for product &1 and quantity &3 is not valid
What causes this issue? The lot size with which the system is to create the PP/DS order is less than or greater than the lot size interval for the PP...