Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RRP -
Message number: 540
Message text: Planned order &1 created as an SNP planned order
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RRP540
- Planned order &1 created as an SNP planned order ?The SAP error message
/SAPAPO/RRP540 Planned order &1 created as an SNP planned order
typically occurs in the context of SAP Advanced Planning and Optimization (APO), specifically within the Supply Network Planning (SNP) module. This message indicates that a planned order has been created in the SNP planning book, but it may not align with the expectations or configurations set in the system.Cause:
Planning Strategy: The planned order may have been created based on a specific planning strategy that defaults to SNP. This can happen if the product is set up to be planned in SNP rather than in other planning areas like Demand Planning (DP) or Production Planning (PP).
Master Data Configuration: The master data for the product (like the material master or the location) may be configured to use SNP planning, which can lead to the creation of SNP planned orders.
Planning Area Settings: The settings in the planning area may dictate that certain types of orders are created as SNP planned orders.
Resource Availability: If there are constraints or issues with resources in the production planning area, the system may default to creating SNP planned orders.
Solution:
Review Planning Strategy: Check the planning strategy assigned to the product. If it is not intended to be an SNP planned order, consider changing the strategy to one that aligns with your planning needs.
Check Master Data: Review the master data for the material in question. Ensure that the settings for the product are correct and that it is intended to be planned in the desired manner.
Adjust Planning Area Settings: If necessary, adjust the settings in the planning area to ensure that planned orders are created as expected. This may involve changing the configuration in the SNP planning book.
Resource and Capacity Planning: Ensure that resources and capacities are correctly defined and available. If there are constraints, address them to allow for the creation of planned orders in the desired manner.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the configuration of SNP and planned orders.
Testing: After making changes, conduct tests to ensure that planned orders are created as expected and that the error message does not reoccur.
Related Information:
/SAPAPO/RRP3
for viewing the planning board and /SAPAPO/SDP94
for displaying the SNP planned orders.By following these steps, you should be able to identify the cause of the error message and implement a solution to address it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RRP539
The desired activity &1 does not exist in operation &2
What causes this issue? The activity &V1& does not exist in operation &V2&.System Response You have configured the scheduling parame...
/SAPAPO/RRP538
Subcontracting purch. req. for subcontracting planned order &1 not found
What causes this issue? You want to convert <LS>Supply Network Planning</> (SNP) orders into <LS>Production Planning and Detailed S...
/SAPAPO/RRP541
Planned order &1 filtered out in SAP APO inbound
What causes this issue? In the Implementation Guide for Supply Network Planning (SNP), under <LS>Basic Settings</> -> <LS>Mainta...
/SAPAPO/RRP542
Application for planned order &1 changed by BAdI from SNP to initial
What causes this issue? In SAP R/3, the indicator <LS>Create Planned Orders as SNP Planned Orders</> can be set when an integration model...
Click on this link to search all SAP messages.