Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/RET_MESSAGES -
Message number: 508
Message text: End Date must be later than start date
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/RET_MESSAGES508
- End Date must be later than start date ?The SAP error message
/SAPAPO/RET_MESSAGES508
indicates that there is an issue with the date range specified in a planning or scheduling function within the SAP Advanced Planning and Optimization (APO) module. Specifically, the error states that the end date must be later than the start date. This typically occurs in scenarios where date ranges are defined for planning, forecasting, or other time-sensitive operations.Cause:
- Incorrect Date Input: The most common cause is that the user has entered an end date that is equal to or earlier than the start date.
- System Configuration: There may be a configuration issue in the system that affects how dates are interpreted or validated.
- Data Entry Error: A simple typographical error when entering dates can lead to this issue.
- Date Format Issues: If the date format is not recognized correctly by the system, it may lead to misinterpretation of the dates.
Solution:
- Check Date Inputs: Review the start and end dates you have entered. Ensure that the end date is indeed later than the start date.
- Correct Format: Ensure that the dates are entered in the correct format as expected by the system (e.g., DD/MM/YYYY or MM/DD/YYYY).
- Validation: If you are using a program or transaction that allows for date selection, use the date picker or calendar tool to avoid manual entry errors.
- Review Configuration: If the issue persists, check the configuration settings related to date handling in the APO module. Consult with your SAP Basis or configuration team if necessary.
- Testing: After making corrections, re-run the transaction or process to see if the error is resolved.
Related Information:
If the problem continues after following these steps, it may be beneficial to engage with your SAP support team for further investigation.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/RET_MESSAGES507
Inconsistent database records have been deleted
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RET_MESSAGES506
Deletion not possible; Prod. volume still being used in restriction &1
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RET_MESSAGES509
Assign restriction a production volume or define it as external
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/RET_MESSAGES510
No restrictions found; take case sensitivity into account
What causes this issue? At least one characteristic value assignment was not available in the dataset that was searched.System Response No restricti...
Click on this link to search all SAP messages.