Message type: E = Error
Message class: /SAPAPO/PROD -
Message number: 326
Message text: Use only one mode within the SNP activity &1 &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message /SAPAPO/PROD326 indicates that there is an issue with the configuration of the Supply Network Planning (SNP) activity in SAP Advanced Planning and Optimization (APO). Specifically, this error occurs when multiple planning modes are being used simultaneously in a single SNP activity, which is not allowed.
Cause: The error is triggered when: You have defined multiple planning modes for a single SNP activity. The system expects only one planning mode to be active for the execution of that activity.
Solution: To resolve this error, you can take the following steps: Check SNP Activity Configuration: Go to the SNP activity configuration in the SAP APO system. Verify the planning modes that have been assigned to the activity. Select a Single Planning Mode: If multiple planning modes are assigned, you need to select only one mode for the SNP activity. You can do this by editing the SNP activity and ensuring that only one planning mode is active. Re-run the SNP Activity: After
Get instant SAP help. Sign up for our Free Essentials Plan.
/SAPAPO/PROD325 A non end-start constraint type has been used in operation &1
What causes this issue? Activities with that do not have an end-start relationship have been used within the operation <(>&<)>1.Syste...
/SAPAPO/PROD324 Minimum interval + float greater than maximum interval in mode &1 &2 &3
What causes this issue? You have maintained a minimum time shift for the activity <(>&<)>1 <(>&<)>2. If this minimum...
/SAPAPO/PROD330 Modes must have identical coupling > activity name &1 &2 &3 &4
What causes this issue? Coupling via modes is switched on for the activity relationship (Predecessor: Operation <(>&<)>1 activity <...
/SAPAPO/PROD331 PrimaryResources must have identical coupling > activity name &1 &2 &3 &4
What causes this issue? Coupling via primary resources is switched on for the activity relationship (Predecessor: Operation <(>&<)>1 ...
Click on this link to search all SAP messages.