How To Fix /SAPAPO/PROD325 - A non end-start constraint type has been used in operation &1


/SAPAPO/PROD325 - Overview

  • Message type: E = Error

  • Message class: /SAPAPO/PROD -

  • Message number: 325

  • Message text: A non end-start constraint type has been used in operation &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message /SAPAPO/PROD325 - A non end-start constraint type has been used in operation &1 ?
    The SAP error message /SAPAPO/PROD325 indicates that a non end-start constraint type has been used in an operation within the Advanced Planning and Optimization (APO) module. This error typically arises when there is a mismatch in the type of constraints applied to operations in a production or planning scenario.
    
    Cause: The error is triggered when: An operation is defined with a constraint that is not compatible with its type. For example, if an operation is defined to start at a certain time but is being constrained by an end-start relationship, this can lead to inconsistencies. The operation may have been incorrectly configured in the planning book or in the production process model. There may be a misunderstanding of how the constraints should be applied based on the operation's characteristics.
    Solution: To resolve this error, you can take the following steps: Check Operation Configuration: Review the operation configuration in the production process model or the planning book. Ensure that the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author