Do you have any question about this error?
Message type: E = Error
Message class: /SAPAPO/PROD -
Message number: 311
Message text: More than one setup activity in operation &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PROD311
- More than one setup activity in operation &1 ?The SAP error message
/SAPAPO/PROD311
indicates that there is more than one setup activity defined for a specific operation in the production planning process. This can occur in the context of Advanced Planning and Optimization (APO) when the system encounters conflicting setup activities that cannot be processed simultaneously.Cause:
- Multiple Setup Activities: The primary cause of this error is that the operation in question has been assigned more than one setup activity. This can happen due to incorrect configuration in the production process or when multiple setup activities are defined for the same operation in the production version or routing.
- Routing Configuration: The routing for the material may have been incorrectly set up, leading to multiple setup activities being assigned to a single operation.
- Master Data Issues: There may be inconsistencies or errors in the master data related to the material, such as the production version or the routing.
Solution:
- Review Routing: Check the routing for the material in question. Ensure that only one setup activity is defined for the operation that is causing the error. You can do this by navigating to the routing in the SAP GUI and reviewing the operations and their associated setup activities.
- Adjust Setup Activities: If multiple setup activities are necessary, consider whether they can be combined or if the operation can be split into separate operations, each with its own setup activity.
- Check Production Version: Verify the production version assigned to the material. Ensure that it is correctly configured and does not have conflicting setup activities.
- Master Data Cleanup: Review and clean up any inconsistencies in the master data related to the material, including the bill of materials (BOM), routing, and production versions.
- Consult Documentation: Refer to SAP documentation or help resources for guidance on how to properly configure setup activities in your specific version of SAP APO.
Related Information:
C202
(Change Routing) or C201
(Display Routing) to review and modify the routing.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PROD310
Mode &1 must contain ONE calendar resource
What causes this issue? Only one calendar resource is allowed per mode. The working times of this resource are used in scheduling. If the other resou...
/SAPAPO/PROD309
In operation &1 - &2 mode &3: Main resource not maintained as resource.
What causes this issue? The main resource of the mode has not been entered in the resource list.How to fix this error? While in the change mode in t...
/SAPAPO/PROD312
Setup activity in operation &1 has relationships to preceding activities
What causes this issue? The setup activity must always be the first activity in the operation for the sequence-dependent setup. It may not be related...
/SAPAPO/PROD313
Sequence-dependent setup in operation &1 not on single activity resource
What causes this issue? You should work with sequence-dependent setups in this operation. The main resources that are defined in the modes are not si...
Click on this link to search all SAP messages.