Message type: E = Error
Message class: /SAPAPO/PROD -
Message number: 309
Message text: In operation &1 - &2 mode &3: Main resource not maintained as resource.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
/SAPAPO/PROD309
- In operation &1 - &2 mode &3: Main resource not maintained as resource. ?The SAP error message
/SAPAPO/PROD309
typically occurs in the context of Advanced Planning and Optimization (APO) when there is an issue with the resource configuration in the production planning process. This error indicates that a main resource has not been maintained for a specific operation in a production process.Cause:
The error message
/SAPAPO/PROD309
is triggered when:
- A production order or a planned order is being processed, and the system cannot find a main resource assigned to the operation.
- The resource that is supposed to be used for the operation is either not defined in the system or not properly assigned to the operation in the production process.
- The resource may not be activated or may not have the necessary settings to be used in the planning run.
Solution:
To resolve this error, you can take the following steps:
Check Resource Configuration:
- Go to the resource master data in SAP APO and ensure that the resource is correctly defined.
- Verify that the resource is active and has the necessary settings for the operation.
Assign Main Resource:
- Open the relevant production order or planned order in the system.
- Navigate to the operation details and check if a main resource is assigned.
- If not, assign the appropriate main resource to the operation.
Review Production Version:
- Ensure that the production version used for the order has the correct resource assigned.
- If necessary, create or modify the production version to include the main resource.
Check Planning Settings:
- Review the planning settings in the APO system to ensure that the resource is included in the planning run.
- Make sure that the resource is part of the relevant planning area.
Consult Documentation:
- Refer to SAP documentation or help resources for additional guidance on resource management in APO.
Testing:
- After making the necessary changes, re-run the planning or production order process to see if the error persists.
Related Information:
/SAPAPO/RES01
(Resource Master) or /SAPAPO/ORDR
(Order Management) to access and modify resource settings.By following these steps, you should be able to resolve the /SAPAPO/PROD309
error and ensure that your production planning processes run smoothly.
Get instant SAP help. Start your 7-day free trial now.
/SAPAPO/PROD308
Activity network is not coherent.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PROD307
Activity network contains cycle.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
/SAPAPO/PROD310
Mode &1 must contain ONE calendar resource
What causes this issue? Only one calendar resource is allowed per mode. The working times of this resource are used in scheduling. If the other resou...
/SAPAPO/PROD311
More than one setup activity in operation &1
What causes this issue? The operation has more than one setup activity. However, only one setup activity is allowed per operation for the time-depend...
Click on this link to search all SAP messages.